Home > Vertical Stabilizer > Deburred, Dimpled, Countersunk, Scuffed, Cleaned and Ready for Primer

Deburred, Dimpled, Countersunk, Scuffed, Cleaned and Ready for Primer

August 4th, 2011

Prepped Today, Prime Tomorrow

Today was another productive day. I was able to get the VS-808PP Doubler cleaned up, deburred, and countersunk. Cleaning the lightening holes was a challenge at first. Then I simply grabbed my Dremel and a sanding drum and was able to get the punch/shear marks cleaned up. The other challenge was the V notch, so I have some fine toothed rounded files that seemed to fit the bill. After that was done, I was able to dimple all the ribs and spars. Had to pull out the pop rivet dies to get to the nose holes on the VS-706 rib and the VS-801PP skin.

The VS-808PP Doubler prep took most of the evening, but it looks like a real airplane part. Last thing was to scuff all the parts including the inside of the skin. I hope to have good weather tomorrow after work. If so, then priming all the parts will be done and drying overnight. Then I can have a solid Saturday assembling the VS for good.

 

 

Categories: Vertical Stabilizer
Comments are closed.