RV7-Factory

SilverEagle2's RV-7 Builders Log
  • Home
  • Welcome to the Insanity!
  • Who is this Nut?
  • Latest Progress
  • Progress Diagram
  • Archive
Home > RV Factory/Shop > RV Factory Construction/Setup

RV Factory Construction/Setup

April 20th, 2011

Slideshow of the RV Factory being built and setup.

Google Photos of Shop Construction

 

Categories: RV Factory/Shop
Comments are closed.
Tail Crate Opened Welcome to RV7-Factory.com

Log Navigation

  • Builders Log (159)
    • Empennage (69)
      • Elevators (28)
      • Horizontal Stabilizer (19)
      • Rudder (14)
      • Vertical Stabilizer (5)
    • Fuselage (4)
    • Wings (86)
      • Major Wing Sections (43)
      • Tanks (40)
  • Hangar Chat (12)
  • RV Factory/Shop (13)

Recent Posts

  • I’m still here, and so is the project
  • Right Wing Top Skins Completed
  • Right Tank Installed and Top Skins Fit for Final Riveting
  • Right Leading Edge Riveted to Spar and Skins Test Fit
  • Right Leading Edge Riveted and Light Cutout Done

Build History

June 2026
S M T W T F S
 123456
78910111213
14151617181920
21222324252627
282930  
« Feb    

Excellent Logs by Other Builders

  • Jason Beaver RV-7
  • Matt Burch RV-7
  • Mike Bullock RV-7
  • Jason Rouault RV-7A
  • Bruce Swayze RV-7A

GA Links

  • Civil Air Patrol
  • AOPA

RV Links

  • Vans Air Force
  • Vans Aircraft
  • Experimental Aircraft Association

Donate to Civil Air Patrol, Utah Wing





Top WordPress
Copyright © 2011-2026 RV7-Factory
iNove Theme Customized by Author