Home > Tanks > Fuel Tanks Started

Fuel Tanks Started

September 13th, 2012

Right Tanks Works Begins

I was able to get the tank ribs deburred completely and started assembling the right tank in preparation for the “Checkoway” method of completing the baffle brackets. (More specifics to come as I complete them.) It was a short night and I need to get some hardware in order to do the brackets anyway, so after I clecoed the right tank together, I called it a night. Some progress is better than no progress.

As with the leading edge assemblies, I did not have any trouble getting the ribs in the skins. Everything lined right up. I guess I just got a good kit.

Categories: Tanks
Comments are closed.