Archive

Archive for October 15th, 2012

Started Right Tank Inboard Rib Modifcations

October 15th, 2012 No comments

Brackets and Access Covers Done

I was able to get the T-405-R fabricated, drilled, and match drilled to the right rib and T-410. I then cut the access hole with my fly-cutter and riveted on the platenuts and T-407 to the T-703-R. I also drilled the anti-rotation bracket holes and the holes for the fuel pickups. Not a lot of description, but basically a repeat of the last time I was in the shop.

At this point, it is time to fit the capacitive fuel level senders and the other fittings for the vents and fuel return lines for the fuel injection and these ribs will be prepped.

Categories: Tanks