Archive

Archive for September 28th, 2012

Bolted Z Brackest for Left Tank to Spar

September 28th, 2012 No comments

No pictures, but I was able to get the z-brackets bolted to the spar on the left wing in prep for the “Checkoway” method on that tank. I may not get to it for a bit, but they are ready.

Categories: Tanks